Several Essequibo Coast residents have expressed concern about a section of the troubled multi-million dollar stelling at Good Hope on the Essequibo Coast which has been deteriorating for several weeks.
The stelling, which was built at a cost of $574M, has been in operation for over a year with a stipulated weight limit for trucks and this newspaper was informed recently that a section of the facility, close to a