EDWC flood control plan moves ahead

The initial results of the modelling exercise for the master plan for enhancing flood control capacity within the East Demerara Water Conservancy (EDWC) and the lowland drainage system are expected to be available in the first half of 2012.

The project falls under the World Bank-funded US$3.8 million Conservancy Adapta-tion Project (CAP), which is financing the development of the technical foundation for a master