Guidelines for design of Amaila Falls road poorly done – review

Fip Motilall

A review of the Amaila Falls access road conducted by external consultants in June highlighted the poorly outlined specifications in the original project document and recommended immediate changes to the design including widening the road and reducing its steepness (grades).

According to documents seen by this newspaper, Sithe Global, the developer of the project, contracted BBFL Caribbean Ltd in collaboration with Earth Investigation Systems Ltd to undertake a review of the proposed road to see whether the road, as designed and specified, would be able to function for its intended use. The review was conducted by the consultants in June and a final report was released in July.

Reliable sources provided evidence to this newspaper which suggested that the report came months after representatives from the proposed hydropower contractor China Railway visited here in