GWI to fix two defective pumps in arid Rupununi

With arid weather continuing in Region Nine, a Guyana Water Inc (GWI) team will be addressing defective pumps and providing other help.

A GWI release said that its Hinterland Team is currently conducting remedial works and other interventions in Central Lethem, Aishalton, Achiwib, Region 9 (Upper Takutu/Upper Essequibo), Kamwatta and Koko, Region 1 (Barima/Waini).

According to Hinterland Manager, GWI, Osei Manifold, because of the prolonged dry season, the static water level of the