Construction of second FPSO on schedule

The Liza Unity FPSO

The Liza Unity Floating Production, Storage and Offloading (FPSO) oil platform, which is under construction in Singapore, is on track for departure to the Liza field in the Stabroek block offshore Guyana later this year.

Once completed, Liza Unity will be the second FPSO at the ExxonMobil-operated Liza field and is scheduled for start-up in 2022. The FPSO is being constructed by SBM Offshore Guyana.

A release by the company said that the Fast4Ward Multi-Purpose Floater (MPF) hull moved to the integration quayside in the Keppel shipyard at Tuas, Singapore, where the topsides integration phase started.