Prosperity FPSO hull arrives in Singapore

The Prosperity FPSO hull arriving in Singapore (SBM Offshore photo)

The hull for the Prosperity Floating Production Storage and Offloading (FPSO) unit is now moored next to the Liza Unity at the Keppel yard in Singapore as SBM Offshore prepares to commence with the next phase of construction.

SBM Offshore has announced that the hull for the Prosperity FPSO has arrived safely at the Keppel yard in Singapore, paving the way for the next stage of construction to commence with the topside modules being integrated at the yard.

In a statement, the company noted that despite the various challenges posed by the global COVID-19 pandemic, the FPSO remains on schedule to be completed in 2024. It was disclosed that drydock activities are scheduled to begin in the fourth quarter of this year, with the installation of major structures that will support the Mooring and Subsea Risers.